Epoxy floor coatings are typically applied with one primer coat and two layers of epoxy floor coating. These floors are ideal for garages and storage spaces since they can withstand light to medium wear and tear.

If you have a floor that is subjected to heavy industrial use you should consider installing a self-leveling floor. The thickness of a self-leveling epoxy floor is usually greater.  The steps for applying epoxy floor paint are summarized in the following tutorial. This method is for a straightforward roller-applied floor.

Before applying the epoxy, the surface must be prepared.

In order to achieve adhesion between the epoxy product and the substrate, the substrate must be prepared. Surface preparation is, in fact, the most critical stage. The floor could crumble if it isn’t properly prepared, and repairing it would be far more expensive.

floor paint colours

Cleaning and sweeping the floor

The floor must now be vacuumed. Before applying any sort of epoxy paint, there must be no dust or residue. Otherwise, numerous particles will become trapped within the coat. The ability to stick together will be severely harmed.

How to Apply Epoxy: Apply a suitable epoxy primer to the floor.

Now you must prepare the surface that will allow the epoxy to adhere to your substrate effectively. This is why epoxy primer is used. Never skip priming the floor; don’t be fooled by statements that it’s not necessary.

Epoxy grout should be used to fill all cracks, holes, and other crevices.

Before you can begin coating, you must first repair any holes, dents, or cracks in the floor. If you have large and deep holes, you may want to fill them with quick-drying cement mortar ahead of time. Before grinding and applying the primer, you should finish this step first.

The first coat of epoxy paint is applied.

The first coat is frequently used to assist show the floor. The initial coat of colored epoxy will reveal the condition of the actual substrate. Now is the time to see if there are any residual cracks or holes!

Before applying the final epoxy floor paint, final sanding and filling are required.

The first coat should be sufficiently dry after 16-24 hours, allowing you to move on to the following phase. After applying the first layer, you may discover a variety of difficulties, such as new cracks and holes. Also, dust and debris can get caught in the first coat.